PENGARUH ASPEK PELAKSANAAN KONSTRUKSI TERHADAP KINERJA WAKTU PROYEK (STUDI KASUS DI DINAS CIPTA KARYA DAN TATA RUANG PROVINSI JAWA TENGAH).
Text (Hasil Peer Review)
c3_pr_jt.pdf Download (2MB) |
|
Text (Hasil Turnitin)
C3_Tur_pengaruh_aspek.pdf Download (1MB) |
Item Type: | Other |
---|---|
Subjects: | Dokumen Pendukung |
Depositing User: | Vokasi Undip |
Date Deposited: | 15 Feb 2021 07:17 |
Last Modified: | 18 Mar 2021 02:43 |
URI: | https://doc-pak.undip.ac.id/id/eprint/5620 |
Actions (login required)
View Item |